Preparation to Blast Cleaning for Polyurethane
Coating
Prior
to blast cleaning, the each pipe shall be inspected by the
followings;
-
Pipe
identification control
-
Pipe shall be
accepted as PE coated pipe condition
-
The external
surface control
-
The pipe
internal surface shall be inspected and cleaned to remove all
traces of oil, grease and loose deposits. Any visible trace of
oil or grease shall be removed using an appropriate non-oily and
non-toxic product.
-
If pipes have
been in contact with marine or industrial atmosphere, they shall
be cleaned before abrasive blasting to remove any contamination.
Cleaning shall be carried out using an adapted process.
Surface Preparation :
The
pipe surface shall be grit/shot blasted to ensure the SA 2 1/2
degree of cleanliness.
The
finished pipe surface shall be completely removed all traces of rust
and shall be provided a surface average roughness (RZ)
of 50 to 100 microns.
Pipes
shall be heated to remove any surface moisture and to ensure more
than 3ºC
above the ambient dew point.
The
ambient relative humidity shall not exceed 85 % as measured using a
hydrometer and digital thermometer.
Immediately after abrasive blasting, all dust and traces of
abrasives shall be removed from the pipe surface by brushing and
vacuum cleaning.
Each
cleaned pipe shall be inspected for surface defects. Any defect
shall be removed.
Ambient Control :
The
ambient temperature and ambient relative humidity shall be measured
using
a
hydrometer and digital thermometer.
The
ambient relative humidity and ambient temperature shall be recorded
to the shift report.
The
grit-blasting is not permitted when the ambient relative humidity
exceeds 85 %.
The
metal temperature shall be 3ºC
above the ambient dew point temperature.
Any
pipe which has not been coated before degradation of its surface
preparation shall be completely re-blasted before coating.
Surface Test and Inspection :
The
below tests and inspections shall be performed on blast cleaned
pipe:
Two
methods can be used in measuring surface roughness
measurements.
Method 1- By visual comparison gauge
Method 2- By a digital profile measuring device.
Standard grid and shot comparator is compared to the pipe
surface. The coinciding segment of the comparator shall be decided.
Surface roughness measured by a digital profile measurement device.
Surface roughness shall comply with Rz=50-100
µm
The calibration of equipment shall be performed by reference blocks.
-
Surface cleaning
degree :
Standard comparison pictures are used to decide the degree of the
surface cleanliness. Surface quality degree shall be Sa
2 ½
Residual
dust shall comply with acceptable categories of ISO 8502-3 and
specification.
The
surface defects which appearance effect of grit-blasting or other
reason shall be checked by visual inspection. In case of any
grinding or mechanical reworks, the wall thickness shall be
ultrasonically examined and remaining wall thickness shall be
met minimum specified requirements.
Pipe
external surface shall be cleaned of all dust and foreign matter
using clean dry compressed air or vacuum cleaning. Residual dust
shall comply with categories of ISO 8502-3 and specification.
COATING APPLICATION
If it
shall use to free solvent polyurethane, polyurethane will be
approved for potable water.
The
solvent-free polyurethane is paint to two components, which cures to
a coating with excellent corrosion resistance to fresh water, sea
water and underground storage tanks and to abrasion. It is
applicable in thick coats by standard heavy duty airless spray
equipment, harmless to grain cargo. It use as a lining in potable
water tanks and pipelines, where solvent-free materials are
required.
If it
use for potable water, the surface is preparing to abrasive blasting
to min. Sa 2½ with a surface profile corresponding to ISO Comparator
Rough Medium (G) and Rz 40-70 blasting profile. Oil and grease must
be removed with suitable detergent, salts and other contaminants by
(high pressure) fresh water hosing prior to blasting. After
blasting, clean the surface carefully from abrasives and dust.
On
old steel surfaces having been exposed to salt water, excessive
amounts of salt residues in pitting may call for dry abrasive
blasting, high pressure fresh water hosing, drying, and finally, dry
abrasive blasting again. Alternatively, water jetting may be used
provided the steel surface has already the surface profile as
described above.
Application shall be done with twin feed hot airless spray equipment
complying with the instructions recommended and given by the paint
manufacturer and shall be done in a manner to prevent sags and runs
and to provide adequate thickness in crevices and angles. No thinner
should be added. Pot life is 1 min. at 60ºC.
Pumping viscosity is achieved at 50-70ºC. The temperature in the
mixing unit must be between 65ºC and 75ºC.
Nozzle pressure is 15 MPa and nozzle orifice is approx. 0,58-0,81 mm
depending on required production speed and DFT
There
are two methods as follows.
Fixed boom system consists of :
Fixed
boom and pipe cart for linear movement and pipe turning roll on pipe
cart for circumferential movement of pipe. The combination of linear
and circumferential movements gives spiral movement of pipes.
Movable boom system consists of :
Boom/boom carriage and pipe turning roll unit. The combination of
linear movement of boom and circumferential movement of pipe gives
relatively spiral movement for spraying.
The
coating shall be free of pinholes, skipped areas, roughness,
blistering, cracking and lamination.
The
pipes shall wait on waiting bench according to instructions
recommended of paint manufacturer for curing.
Cleaning of the spray equipment :
The
mixed material will become insoluble within a few minutes after
mixing 60ºC.
The parts of the spraying equipment containing mixed base and
hardener must be cleaned immediately after completion of the job or
during any interruption.
Polyurethane Coating Test :
Surface Cleanliness Comparison
Surface Profile (Roughness)
Dust
Contamination
Coating Thickness
Shore
Hardness ‘D’
Pinhole Test
Impact Resistance
Pull-Off Adhesion
Manual Holiday Test |